SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.,LTD.The construction of CCPP with a capacity of 1500-1600 MW in Surkhandarya region)is looking for: 1.Position and requirementsElectrical Technician Key Responsibilities: - ...

SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.,LTD.The construction of CCPP with a capacity of 1500-1600 MW
in Surkhandarya region)is looking for:
1.Position and requirements
Electrical Technician
Key Responsibilities:
- Complete the work deliverables as assigned by Electrical Manager.
- Plan/Prepare electrical site installation work, such as earthing and lightning protection, cabling, cable trays and conduits, MV/LV switchgear installation and associated panels, VSDs and motors, heaters, transformers, DC system etc.
- Familiar with electrical drawings and carrying out work according to drawings. And make reasonable advice to optimize drawing.
- Provide technical support, supervision and advice to the discipline team and other project teams and participate in peer reviews.
- Prepare and evaluate alternative concept designs, and liaise with other disciplines, both
internally and externally.
- Develop detail designs or detail design/build specifications, manage the preparation of
drawings and prepare tender documentation, to produce engineering deliverables of a high standard.
- Provide assistance and advice during procurement, construction and commissioning activities.
- Plan, coordinate and manage the design, procurement and construction of assigned projects.
- Conduct contract administration and do testing, commissioning and inspections of
installations.
- Develop initiatives to improve the cost-effectiveness and efficiency of project execution.
- Participate in relevant meetings, prepare progress reports and follow required checking procedures.
Present design solutions to clients for approval.
Qualifications and Experience required:
B.sc/B.Eng./B.Tech Electrical Engineering degree (mandatory).
Professional registration with Local Relevant local agencies.
5 to 10 years experience in a similar role.
Experience in the construction, commissioning of utility-scale solar plants will be considered a plus.
Others:
Valid RSA driver’s license (mandatory).
Have own Computer/Laptop and Cell phone (mandatory).
Key Competencies and Generic Skills:
Familiar with AutoCAD and a proven track record in the design of electrical systems (mandatory).
Sign-off of the MV/LV design and works (mandatory).
Familiar with the GOST and local Electrical standards.
Strong computer literacy skills with Microsoft Office packages including Outlook, PowerPoint, Word, Excel etc
Able to read and understand electrical schematics, drawings and prints
Able to read and interpret procedural manuals, MoS and documents related to safety regulations.
Excellent communication and interpersonal skills
Fluent in English.

International Recruitment Announcement
Surkhandarya 1600MW CCPP Project – Uzbekistan
Company Name:SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD
Location: Near Termez, Uzbekistan
Project Type: Gas-fired Combined Cycle Power Plant (EPC)
Project Duration: Until August 2027
Our company has been engaged in overseas power plant construction since 2003, with a highly experienced team and strong project management capabilities. Our business scope covers a wide range of sectors, including thermal power, nuclear power, desalination, infrastructure, solar thermal, photovoltaic, wind power, energy storage, as well as commissioning and operation services.
We operate globally, with projects in more than 20 countries. Key projects are located in Saudi Arabia, the United Arab Emirates, Uzbekistan, Qatar, Abu Dhabi, Oman, Kuwait, Thailand, Iraq, South Africa, Morocco, and Kenya.
The project is a 1600MW gas-fired combined cycle power plant (CCPP), which is the third project undertaken by our company in Uzbekistan. It is located 12 kilometers north of the city of Termez, where the environment is relatively good and close to the city. (The construction of CCPP with a capacity of 1500-1600 MW in Surkhandarya region)
The previous two projects have been successfully completed with high-quality performance. Our company serves as the EPC (Engineering, Procurement, and Construction) contractor for this project.
The project is scheduled to be completed by August 31, 2027. It is located near Termez City in southern Uzbekistan, approximately a 30-minute drive from the city center, offering convenient access.
The project team is composed of highly experienced professionals. Managers in disciplines such as turbine, boiler, electrical, instrumentation & control, commissioning, and HSE each have experience in at least three similar projects.
Uzbekistan offers a pleasant climate, beautiful natural scenery, a safe environment, and a friendly local culture. The country is currently experiencing rapid development in the energy sector. Our company is actively expanding its business in Uzbekistan, providing strong prospects for future growth and long-term opportunities.
We are an international EPC contractor with over 20 years of overseas experience in power plant construction.
Projects have been delivered in 20+ countries, including the Middle East, Central Asia, Africa, and Southeast Asia.
This is our 3rd project in Uzbekistan, with previous projects successfully completed.
Every 6 months:
Company will provide and pay for:
(All legal working documents arranged by company)
We are hiring experienced personnel in:
Experience in power plant projects is preferred.
Please send your CV with:
HR Email: surkhandarya_hr@tiejun.com.cn
WhatsApp/Telegram: +998 935266886
Вакансии, которые могут Вас заинтересовать
SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.,LTD.The construction of CCPP with a capacity of 1500-1600 MW in Surkhandarya region)is looking for: 1.Position and requirementsElectrical Technician Key Responsibilities: - ...
